Calligra/Schedules/2.9/Release Plan: Difference between revisions
No edit summary |
(→2.9.5) |
||
Line 47: | Line 47: | ||
* Release June 3rd | * Release June 3rd | ||
== 2.9.6 == | |||
* Tagging July 4th | |||
* Release July 8th | |||
== 2.9.7 == | |||
* Tagging August 1st | |||
* Release August 5th | |||
Subsequent release will be planned on a case-by-case basis. | Subsequent release will be planned on a case-by-case basis. |
Revision as of 22:22, 14 June 2015
See also: Feature Plan, Quality Control
Freezes
Master is never frozen for features or strings. The branch calligra/2.9 is always frozen for features or strings.
Testing
Beta 1 (2.8.90)
- Tagging and branching (calligra/2.9) December 6th (no big merge on that day)
- Release December 10th
Beta 2 (2.8.91)
- Tagging January 11th
- Release January 15th
Beta 3 (2.8.92)
- Tagging February 8th
- Release February 12th
Stable releases
2.9.0
- Tagging February 22nd
- Release February 26th
2.9.1
- Tagging March 7th
- Release March 11th
2.9.2
- Tagging March 28th
- Release April 1st
2.9.3
- Tagging April 25th
- Release April 29th -- Cancelled (even if it can be available for download in some distros)
2.9.4
- Tagging May 2nd
- Release May 6th
2.9.5
- Tagging May 30th
- Release June 3rd
2.9.6
- Tagging July 4th
- Release July 8th
2.9.7
- Tagging August 1st
- Release August 5th
Subsequent release will be planned on a case-by-case basis.