Calligra/Schedules/2.9/Release Plan: Difference between revisions
(Makes more sense this way) |
No edit summary |
||
Line 24: | Line 24: | ||
== 2.9.0 == | == 2.9.0 == | ||
* Tagging | * Tagging January [???] | ||
* Release | * Release January [???] | ||
== 2.9.1 == | == 2.9.1 == |
Revision as of 19:28, 3 December 2014
See also: Feature Plan, Quality Control
Freezes
Master is never frozen for features or strings. The branch calligra/2.9 is always frozen for features or strings.
Testing
Beta 1 (2.8.90)
- Tagging and branching (calligra/2.9) December 6th (no big merge on that day)
- Release December 10th
Beta 2 (2.8.91)
- Tagging December 27th
- Release December 30th
Beta 3 (2.8.92)
- Tagging January 4th
- Release January 7th
Stable releases
2.9.0
- Tagging January [???]
- Release January [???]
2.9.1
- Tagging [???]
- Release [???]
2.9.2
- Tagging [???]
- Release [???]
2.9.3
- Tagging [???]
- Release [???]
2.9.4
- Tagging [???]
- Release [???]