IUP ISI/MediaWiki-Silk/Scrum notes/2011-01-05: Difference between revisions

From KDE Community Wiki
No edit summary
Line 1: Line 1:
Scrum meeting du 05/01/2011
Scrum meeting du 05/01/2011


== Travail réalisé depuis le dernier Scrum meeting==
== Work done since the last Scrum meeting ==


* Install operating systems and library
* Install operating systems and library
Line 11: Line 11:
* Study project compilation
* Study project compilation


== Difficultés rencontrées ==
== Encountered difficulties ==


* CDash documentation lakes
* CDash documentation lakes
Line 20: Line 20:
* One computer is slow (too older)
* One computer is slow (too older)


== Travail à réaliser jusqu’au prochain Scrum meeting ==
== Work to do until the next Scrum meeting ==


* Finish installing operating systems and library
* Finish installing operating systems and library

Revision as of 17:56, 5 January 2011

Scrum meeting du 05/01/2011

Work done since the last Scrum meeting

  • Install operating systems and library
  • Make a prensentation for L3
  • send emails to PO and technical contacts
  • Make courses about C++ and Qt
  • Study and install CDash
  • Gitorious and IceScrum registration
  • Study project compilation

Encountered difficulties

  • CDash documentation lakes
  • One computer missing
  • 2 virtual machine problems
  • Wifi connection (Eduroam)
  • C++ experience
  • One computer is slow (too older)

Work to do until the next Scrum meeting

  • Finish installing operating systems and library
  • Investigate library code refactoring
  • Finish installing CDash and explain it
  • Read C++/Qt & git tutorials
  • Read project code
  • Find another computer