Solid/Sprint2010: Difference between revisions

From KDE Community Wiki
Line 78: Line 78:


== Agenda ==
== Agenda ==
*Solid/Kde-hardware-group as a team/group
 
*NetworkManager Solid::Control free
=== Topics for discussion ===
*PowerManagement Solid::Control free
* Solid/Kde-hardware-group as a team/group, metalworkers unite!
*Edit NetworkManager system connections
* Design discussion: NetworkManager Solid::Control free
*Integration between bludevil and Plasma NM to use cell phone as bluetooth modem
* Design discussion: PowerManagement Solid::Control free
*Rework PowerDevil: how and why (discussion)
* Edit NetworkManager system connections
*Inhibition on the Desktop: why and how (discussion)
* Integration between bluedevil and Plasma NM to use cell phone as bluetooth modem
*Actually refactor PowerDevil
* Rework PowerDevil: how and why (discussion)
*...
* Inhibition on the Desktop: why and how (discussion)
* ...
 
=== Code Goals ===
* Have the new libsolid backends releasable: udisks, upnp, upower
* Produce a first version of the udev backend for libsolid (still needs to find a maintainer)
* Produce a first version of the bluez backend for libsolid
* Refactor PowerDevil (powermanager disappears from libsolidcontrol)
* Refactor the network management stack (network classes disappear from libsolidcontrol)

Revision as of 21:32, 22 September 2010

Dates

1/October/2010: Arrival and hacking starting from 09:00 local time
2/October/2010: Hacking
3/October/2010: Hacking and departure

Location

The event will take place in Madrid, In the offices of ufocoders (Calle Ana Mariscal 5 , 28223 Pozuelo de Alarcón). The office is not down town, but in a offices/recreative places (with a cinema, restaurants etc).


Picture Of the building
Note: The building is not constructed in the maps
Note2: I tried to edit openstreetmaps to add more information but to do it I have to have Flash, and I don't, sorry :/

Hotel Location

i-hotel: http://www.eurostarsihotel.com/ Virgilio, 4, Pozuelo de alarcón, 28223

Contact Information

Alejandro Fiestas Olivares +34651620051 and Rafael Fernández López +34650321043

How to get there

The Office where the sprint will take place is connected very well with the airport (Barajas) and with the main Train Station:

  • Atocha Station (Train)


MetroMadrid website

Accomodation

afiestas: Nothing yet, but it should be around 49,99.

Attendees List

The column "Sponsoring needed?" is to know if you need sponsoring or if you pay the travel/stay by yourself.

We do not know (yet) how the food will be (restaurant, catering etc...) but anyway the office is near a lot of fast food places (McDonals, Foster hollywood, Burger King, Other local stuff), so in any case it should be cheap.

Name email Project/Interest Arrival Departure Airport Flight Food preferences Room preferences Estimated travel costs Sponsoring needed? Work Special
Alejandro Fistas (afiestas) alex at ufocoders B0t com NetworkManager//Bluetooth 1.0 4.0 none by car none none 0 € no Author of BlueDevil and starting to dig in NetworkManager anything)
Kevin Ottens (ervin) ervin at kde dot com Solid gatekeeper 1st in the morning 3rd in the evening MAD IB8775 no seafood (except sushis, go figure) none ~350 € (it raised fast) yes Community building, libsolid maintainance, delegating. :-) none
Rafael Fernández López (ereslibre) ereslibre at kde dot com Bluetooth N/A N/A N/A N/A none none N/A no Community building, author of libbluedevil, author of bluedevil none
Dario Freddi (drf) drf at kde dot org Power management & friends 1st, 9.40 AM 3rd, 8 PM MAD AZ7914 - AZ7099 none none 121.03€ yes Kill Solid::Control, discussions, rework PowerDevil, and $something nobody wants to do none
Paulo Romulo (promulo) paulo.romulo at kdemail dot net Solid UPnP backend 1st, around 7 AM 4th, around 12 PM MAD (not booked yet) anything none 1394 € :-( yes API refinements, debug app, neighborhood plasmoid, whatever ervin delegates... :-p none
Sebastian Kügler (sebas) sebas at kde dot org Solid Plasma Widgets 1st, around 1600 4th, around 6 AM MAD (not booked yet) none none 200€ yes Network & Power Management none
Albert Astals Cid (tsdgeos) aacid at kde dot org 2nd, around 10 AM 3rd, around 8 PM MAD EI592 - EI595 none none - no none
Lamarque Souza (lamarque) lamarque at gmail dot com Modem Manager, Plasma Widgets, bug fixing 1st, around 12:15 3rd, around 23:00 MAD TAM 8064 (booked) none none 1310 € :-( yes Author of ModemManager backend none
Will Stephenson wstephenson at kde dot org Network Management, distro integration advice 1st, around 1405 3rd, 1525 MAD LH4424 none double+cot 250 € yes Network Management none

Catering

  • Beer
  • Coke
  • Fruit juice (orange, grape, something else?)
  • Sandwiches
  • Good coffee (nespresso ?)
  • Tea

Agenda

Topics for discussion

  • Solid/Kde-hardware-group as a team/group, metalworkers unite!
  • Design discussion: NetworkManager Solid::Control free
  • Design discussion: PowerManagement Solid::Control free
  • Edit NetworkManager system connections
  • Integration between bluedevil and Plasma NM to use cell phone as bluetooth modem
  • Rework PowerDevil: how and why (discussion)
  • Inhibition on the Desktop: why and how (discussion)
  • ...

Code Goals

  • Have the new libsolid backends releasable: udisks, upnp, upower
  • Produce a first version of the udev backend for libsolid (still needs to find a maintainer)
  • Produce a first version of the bluez backend for libsolid
  • Refactor PowerDevil (powermanager disappears from libsolidcontrol)
  • Refactor the network management stack (network classes disappear from libsolidcontrol)