SoK/2024/StatusReport/AakarshMJ: Difference between revisions
< SoK | 2024/StatusReport
(Created page with "'''SUSTAINABILITY 1: TESTING AND DEVELOPEMENT OF "KECOLAB" ''' '''Project Abstract:''' Following are the deliverables: # Integrate Okular sus scripts into Okular's Pipeline (Solves #2) # Integrate CI/CD pipelines with E2E tests or Integration tests (Solves #10): ## Have Kate/Okular scripts(xdotool, Selenium and KdeEcoTest) which would be a CI test after each MR to make sure KEcoLab works well. ## To make sure energy requirement measured using all 3 scripts menti...") |
(No difference)
|
Revision as of 18:48, 6 February 2024
SUSTAINABILITY 1: TESTING AND DEVELOPEMENT OF "KECOLAB"
Project Abstract:
Following are the deliverables:
- Integrate Okular sus scripts into Okular's Pipeline (Solves #2)
- Integrate CI/CD pipelines with E2E tests or Integration tests (Solves #10):
- Have Kate/Okular scripts(xdotool, Selenium and KdeEcoTest) which would be a CI test after each MR to make sure KEcoLab works well.
- To make sure energy requirement measured using all 3 scripts mentioned above remains constant with +-(5 to 10)% accuracy rate after every MR
- Usage scenario scripting with Selenium(Solves #5)
- Usage scenario scripts with KdeEcoTest
Weekly Progress:
- Week 1-2: