Scrum meeting du 05/01/2011
Scrum meeting du 05/01/2011


== Travail réalisé depuis le dernier Scrum meeting==
== Work done since the last Scrum meeting ==


* Install operating systems and library
* Install operating systems and library
* Make a prensentation for L3
* Make a prensentation for L3
* send emails to PO and technical contacts
* Send emails to PO and technical contacts
* Make courses about C++ and Qt
* Make courses about C++ and Qt
* Study and install CDash
* Study and install CDash
* Gitorious and IceScrum registration
* Register on Gitorious and IceScrum
* Study project compilation
* Study project compilation


== Difficultés rencontrées ==
== Encountered difficulties ==


* CDash documentation lakes
* CDash documentation lakes
* One computer missing
* One computer missing
* 2 virtual machine problems
* 2 virtual machine problems
* Wifi connection (Eduroam)
* Wifi connection problems (Eduroam)
* C++ experience
* C++ experience
* One computer is slow (too older)
* One computer is slow (too older)


== Travail à réaliser jusqu’au prochain Scrum meeting ==
== Work to do until the next Scrum meeting ==


* Finish installing operating systems and library
* Finish installing operating systems and library
* Investigate library code refactoring
* Investigate library code refactoring
* Finish installing CDash and explain it
* Finish installing CDash and explain it to the team
* Read C++/Qt & git tutorials
* Read C++/Qt & git tutorials
* Read project code
* Read project code
* Find another computer
* Find another computer

Latest revision as of 18:53, 6 January 2011

Scrum meeting du 05/01/2011

Work done since the last Scrum meeting

  • Install operating systems and library
  • Make a prensentation for L3
  • Send emails to PO and technical contacts
  • Make courses about C++ and Qt
  • Study and install CDash
  • Register on Gitorious and IceScrum
  • Study project compilation

Encountered difficulties

  • CDash documentation lakes
  • One computer missing
  • 2 virtual machine problems
  • Wifi connection problems (Eduroam)
  • C++ experience
  • One computer is slow (too older)

Work to do until the next Scrum meeting

  • Finish installing operating systems and library
  • Investigate library code refactoring
  • Finish installing CDash and explain it to the team
  • Read C++/Qt & git tutorials
  • Read project code
  • Find another computer