< IUP ISI | MediaWiki-Silk
Difference between revisions of "IUP ISI/MediaWiki-Silk/Scrum notes/2010-10-11"
(copyedit) |
|||
Line 3: | Line 3: | ||
== Work done since the last Scrum meeting == | == Work done since the last Scrum meeting == | ||
− | * | + | * Finished the powerpoint presentation |
− | * | + | * Chatted with Guillaume on IRC |
− | * | + | * Planned the 1st sprint |
− | * | + | * Validated user stories |
− | * | + | * Got back and modified the kde-silk project from Gitorious |
− | * | + | * Talked about scrum meetings planning |
− | == | + | == Issues encountered == |
* IceScrum bugs | * IceScrum bugs | ||
Line 17: | Line 17: | ||
== Work to do until the next Scrum meeting == | == Work to do until the next Scrum meeting == | ||
− | * Define a | + | * Define a prelimilary architecture of the library |
* Chat with “sebas” on IRC | * Chat with “sebas” on IRC | ||
* Contact “ervin” about the tests | * Contact “ervin” about the tests | ||
* Update the project vision | * Update the project vision | ||
* Make the definition of done | * Make the definition of done |
Latest revision as of 16:20, 12 October 2010
Scrum meeting of the 2010-10-11
Work done since the last Scrum meeting
- Finished the powerpoint presentation
- Chatted with Guillaume on IRC
- Planned the 1st sprint
- Validated user stories
- Got back and modified the kde-silk project from Gitorious
- Talked about scrum meetings planning
Issues encountered
- IceScrum bugs
- Trouble with internet connections
Work to do until the next Scrum meeting
- Define a prelimilary architecture of the library
- Chat with “sebas” on IRC
- Contact “ervin” about the tests
- Update the project vision
- Make the definition of done
This page was last edited on 12 October 2010, at 16:20. Content is available under Creative Commons License SA 4.0 unless otherwise noted.