Calligra/Schedules/3.0/Release Plan

< Calligra‎ | Schedules
Revision as of 02:40, 27 February 2015 by Frinring (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

See also: Feature Plan, Quality Control, Porting Plan

Note-box-icon.png
Note
Status: unreleased

This is the first major/minor version based on Qt 5 and KDE Frameworks 5.

Freezes

Master is never frozen for features or strings. The branch calligra/3.0 is always frozen for features or strings.

Testing

Beta 1 (2.9.90)

  • Tagging and branching (calligra/3.0) [???] (no big merge on that day)
  • Release [???]

Stable releases

3.0.0

  • Tagging [???]
  • Release [???]

3.0.1

  • Tagging [???]
  • Release [???]

3.0.2

  • Tagging [???]
  • Release [???]

3.0.3

  • Tagging [???]
  • Release [???]

3.0.4

  • Tagging [???]
  • Release [???]

This page was last edited on 27 February 2015, at 02:40. Content is available under Creative Commons License SA 4.0 unless otherwise noted.