Calligra/Schedules/2.9/Release Plan: Difference between revisions

From KDE Community Wiki
Line 52: Line 52:


== 2.9.7 ==
== 2.9.7 ==
* Tagging August 1st
(delayed 1 month because of regressions)
* Release August 5th
* Tagging August 29th
* Release September 2nd


Subsequent release will be planned on a case-by-case basis.
Subsequent release will be planned on a case-by-case basis.

Revision as of 20:12, 9 August 2015

See also: Feature Plan, Quality Control

Note

Status: unreleased

Freezes

Master is never frozen for features or strings. The branch calligra/2.9 is always frozen for features or strings.

Testing

Beta 1 (2.8.90)

  • Tagging and branching (calligra/2.9) December 6th (no big merge on that day)
  • Release December 10th

Beta 2 (2.8.91)

  • Tagging January 11th
  • Release January 15th

Beta 3 (2.8.92)

  • Tagging February 8th
  • Release February 12th

Stable releases

2.9.0

  • Tagging February 22nd
  • Release February 26th

2.9.1

  • Tagging March 7th
  • Release March 11th

2.9.2

  • Tagging March 28th
  • Release April 1st

2.9.3

  • Tagging April 25th
  • Release April 29th -- Cancelled (even if it can be available for download in some distros)

2.9.4

  • Tagging May 2nd
  • Release May 6th

2.9.5

  • Tagging May 30th
  • Release June 3rd

2.9.6

  • Tagging July 4th
  • Release July 8th

2.9.7

(delayed 1 month because of regressions)

  • Tagging August 29th
  • Release September 2nd

Subsequent release will be planned on a case-by-case basis.