Calligra/Schedules/2.6/Release Plan

< Calligra‎ | Schedules
Revision as of 15:29, 4 October 2012 by Cyrille (talk | contribs) (Created page with "See also: ../Feature Plan/, ../Quality Control/ {{Note|Status: in development, {{Calligra/Stage}}}} __TOC__ = Freezes = Master is never frozen for features or string...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

See also: Feature Plan, Quality Control

Note-box-icon.png
Note
Status: in development, Alpha

Freezes

Master is never frozen for features or strings. The branch calligra/2.6 is always frozen for features or strings.

Testing

Alpha (2.5.90)

  • Tagging October 5th (no big merge on that day)
  • Release October 10th

Beta (2.5.91)

  • Tagging and branching (calligra/2.6) October 26th (no big merge on that day)
  • Release October 31th

RC (2.5.92)

  • Tagging November 16th (no big merge on that day)
  • Release November 21th

Stable releases

The first stable release should happen about three weeks after the RC, if everything is in order.


Content is available under Creative Commons License SA 4.0 unless otherwise noted.