Difference between revisions of "Calligra/Schedules/2.5/Release Plan"

Jump to: navigation, search
(Stable releases)
(Alpha (2.4.90))
Line 7: Line 7:
 
= Testing =
 
= Testing =
  
== Alpha (2.3.90) ==
+
== Alpha (2.4.90) ==
 
* Tagging May 25th (no big merge on that day)
 
* Tagging May 25th (no big merge on that day)
 
* Release May 30th
 
* Release May 30th

Revision as of 12:12, 21 April 2012

Freezes

Master is never frozen for features or strings. The branch calligra/2.5 is always frozen for features or strings.

Testing

Alpha (2.4.90)

  • Tagging May 25th (no big merge on that day)
  • Release May 30th

Beta (2.3.91)

  • Tagging and branching (calligra/2.5) June 15th (no big merge on that day)
  • Release June 20th

RC (2.3.92)

  • Tagging July 6th (no big merge on that day)
  • Release July 11th

Stable releases

The final release should happen within three weeks after the RC.


Content is available under Creative Commons License SA 4.0 unless otherwise noted.