Calligra/Schedules/2.6/Release Plan
See also: Feature Plan, Quality Control
Freezes
Master is never frozen for features or strings. The branch calligra/2.6 is always frozen for features or strings.
Testing
Alpha (2.5.90)
- Tagging October 5th (no big merge on that day)
- Release October 10th
Beta (2.5.91)
- Tagging and branching (calligra/2.6) October 26th (no big merge on that day)
- Release October 31th
RC (2.5.92)
- Tagging November 24th (no big merge on that day)
- Release November 28th
Stable releases
The first stable release should happen about three weeks after the RC, if everything is in order.