All deadlines are due 23:59 UTC, but if you need a few more hours, notify someone from the release team.
Mon, 10th March: Soft Freeze
Codebase is closed for new, unplanned features. Only planned features and bugfixes are allowed in past this point.
Thu, 13th March: Alpha1
Alpha1 is tagged from trunk. As soon as the tarballs have been confirmed to build and the Release Team thinks they meet enough quality it will be released
Tue, 8th April: Alpha2
Alpha2 is tagged from trunk. As soon as the tarballs have been confirmed to build and the Release Team thinks they meet enough quality it will be released
Thu, 1st May: Hard Freeze
Codebase is frozen for new features. Only bugfixes are allowed. (Exception: Features in Wayland-only codepaths, decided by Martin Grässlin)
Tue, 6th May: Beta
Beta is tagged from trunk. As soon as the tarballs have been confirmed to build and the Release Team thinks they meet enough quality it will be released
Tue, 27th May: RC1
RC1 is tagged from trunk. As soon as the tarballs have been confirmed to build and the Release Team thinks they meet enough quality it will be released
Thu, 29th May: Artwork freeze
All artwork is frozen on this date. No new artwork should be added. Existing artwork can continue to be tweaked and fixed. Changing the default wallpaper is allowed past this date.
Tue, 10th June: Tagging Plasma 2014.6
The branch is frozen for final release tagging. Only urgent fixes, such as those fixing compilation errors, should be committed.
Tue, 17th June: Plasma 2014.6 Final
Final release is released for general consumption.