Calligra/Schedules/2.6/Release Plan: Difference between revisions

From KDE Community Wiki
(Created page with "See also: ../Feature Plan/, ../Quality Control/ {{Note|Status: in development, {{Calligra/Stage}}}} __TOC__ = Freezes = Master is never frozen for features or string...")
 
No edit summary
Line 18: Line 18:


== RC (2.5.92) ==
== RC (2.5.92) ==
* Tagging November 16th (no big merge on that day)
* Tagging November 24th (no big merge on that day)
* Release November 21th
* Release November 28th


= Stable releases =
= Stable releases =


The first stable release should happen about three weeks after the RC, if everything is in order.
The first stable release should happen about three weeks after the RC, if everything is in order.

Revision as of 06:18, 28 October 2012

See also: Feature Plan, Quality Control

Note

Status: in development, Alpha

Freezes

Master is never frozen for features or strings. The branch calligra/2.6 is always frozen for features or strings.

Testing

Alpha (2.5.90)

  • Tagging October 5th (no big merge on that day)
  • Release October 10th

Beta (2.5.91)

  • Tagging and branching (calligra/2.6) October 26th (no big merge on that day)
  • Release October 31th

RC (2.5.92)

  • Tagging November 24th (no big merge on that day)
  • Release November 28th

Stable releases

The first stable release should happen about three weeks after the RC, if everything is in order.