Calligra/Schedules/2.5/Release Plan: Difference between revisions
(→2.5.3) |
(→2.5.2) |
||
Line 32: | Line 32: | ||
== 2.5.2 == | == 2.5.2 == | ||
* Tagging September | * Tagging September 8th (no big merge on that day) | ||
* Release September 12th | * Release September 12th | ||
Revision as of 23:46, 9 September 2012
See also: Feature Plan, Quality Control
Freezes
Master is never frozen for features or strings. The branch calligra/2.5 is always frozen for features or strings.
Testing
Alpha (2.4.90)
- Tagging May 25th (no big merge on that day)
- Release May 30th
Beta (2.4.91)
- Tagging and branching (calligra/2.5) June 15th (no big merge on that day)
- Release June 20th
RC (2.4.92)
- Tagging July 13th (no big merge on that day)
- Release July 18th
Stable releases
2.5.0
- Tagging August 3rd (no big merge on that day)
- Release August 8th
2.5.1
- Tagging August 26th (no big merge on that day) - 4c48c0be38d6
- Release August 29th
2.5.2
- Tagging September 8th (no big merge on that day)
- Release September 12th
2.5.3
- Tagging October 5th (no big merge on that day)
- Release October 10th